Munshiganj Masjid


The Munshiganj Masjid is a landmark project in Munshiganj, designed to serve the community with a beautifully structured place of worship. This project involves meticulous planning, structural drafting, project coordination, and comprehensive management to ensure its successful execution.
1. Structural Design and Drafting • Drafted the detailed structural design of the masjid, ensuring compliance with architectural aesthetics and structural integrity. • Prepared the authority drawing following the Bangladesh PWD Schedule 2018, adhering to local building codes and regulations. 2. Project Management • Served as the project head, overseeing all aspects of the construction and management. • Coordinated with clients, contractors, site engineers, and senior architects to ensure smooth project execution. • Regularly visited the construction site to monitor progress, identify potential issues, and provide immediate solutions. • Used MS Project to prepare and update daily worker sheets and work completion reports. 3. Budget and Cost Management • Created the Bill of Quantities (BOQ) and Minimum Order Quantities (MOQ) to estimate the approximate construction cost. • Surveyed the market with the site engineer to procure high-quality materials at the most competitive prices. • Drafted agreements to finalize deals with clients, ensuring all terms were clear and mutually beneficial. 4. Team Leadership and Coordination • Led a team of engineers, contractors, and workers, ensuring tasks were completed on time and to the highest standards. • Supervised the electrical and plumbing works with the assistance of the electrical engineer to ensure seamless integration with the structural framework. • Managed material requisitions based on site requirements and maintained inventory accuracy. 5. Quality Assurance • Collaborated with senior architects during site visits to address construction errors and maintain quality. • Utilized CCTV monitoring to oversee site activities and ensure adherence to project plans and schedules.
1. Coordination with Multiple Stakeholders: o Maintained constant communication with clients, contractors, and team members to align goals and resolve conflicts effectively. 2. Material Procurement: o Conducted market surveys to find the best products at optimal prices, ensuring both quality and cost-effectiveness. 3. Error Management: o Conducted regular site inspections to detect and correct construction errors promptly. Key Achievements • Successfully drafted detailed structural and authority drawings in compliance with local standards. • Efficiently managed a diverse team, ensuring timely project progress. • Implemented cost-saving strategies through meticulous BOQ and market research. • Maintained high-quality standards across structural, electrical, and plumbing works. Ongoing Responsibilities • Coordinating daily operations and resolving on-site challenges. • Ensuring timely material supply and addressing logistical issues. • Monitoring project progress through worker sheets and CCTV footage. • Maintaining client satisfaction by providing regular updates and addressing concerns promptly.
As a Civil Engineer specializing in Site Supervision, I ensure that construction activities are carried out efficiently, safely, and in compliance with design specifications and project timelines. My approach combines advanced monitoring techniques, such as CCTV tracking, with regular site visits to maintain a strong oversight of project progress.
Key responsibilities include:
• CCTV Monitoring: Continuously track site activities via CCTV to ensure operations align with project plans and safety standards, even when off-site.
• Regular Site Visits: Conduct frequent on-site inspections to assess progress, address issues, and verify the quality of work and materials.
• Coordination: Collaborate closely with contractors and site engineers to resolve challenges, clarify designs, and ensure seamless execution of construction tasks.
• Compliance: Ensure all site activities comply with design specifications, safety regulations, and environmental standards.
• Issue Resolution: Identify and address potential problems proactively, minimizing delays and ensuring smooth project progression.
• Documentation: Maintain detailed records of site activities, progress, and any deviations, ensuring transparency and accountability.
• Stakeholder Communication: Provide regular updates to clients, project managers, and other stakeholders, ensuring alignment with project goals.
By combining technology-driven monitoring with hands-on site supervision and effective collaboration, I ensure that projects are executed efficiently, safely, and to the highest standards. My proactive approach helps minimize risks, resolve challenges swiftly, and deliver successful construction outcomes.
Conclusion
The Munshiganj Masjid project reflects my ability to manage large-scale construction projects with precision and efficiency. From structural design to project coordination, my comprehensive involvement has been crucial in maintaining quality and ensuring the project meets its intended goals. As the project progresses, I remain committed to delivering a landmark structure that stands as a testament to our team's dedication and expertise.